Triple

T16939666
Position Surface form Disambiguated ID Type / Status
Subject United States Nuclear Tests July 1945 through September 1992 (DOE/NV-209) E410917 entity
Predicate instanceOf P0 FINISHED
Object nuclear testing catalog C38273 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear testing catalog
Context triple: [United States Nuclear Tests July 1945 through September 1992 (DOE/NV-209), instanceOf, nuclear testing catalog]
  • A. nuclear test
    A nuclear test is an experimental detonation or controlled release of nuclear energy conducted to develop, evaluate, or demonstrate the performance and effects of nuclear weapons or technology.
  • B. nuclear weapons test series
    A nuclear weapons test series is an organized sequence of nuclear detonations conducted under a unified program or objective to develop, evaluate, or demonstrate nuclear weapon capabilities.
  • C. atomic bomb test
    An atomic bomb test is a controlled detonation of a nuclear device conducted to evaluate its design, yield, and effects for military, scientific, or political purposes.
  • D. former nuclear test site
    A former nuclear test site is a geographically defined area where nuclear weapons or devices were previously detonated for testing purposes and which may still be subject to environmental monitoring, contamination concerns, and restricted use.
  • E. plutonium implosion-type nuclear bomb
    A plutonium implosion-type nuclear bomb is a weapon that uses precisely timed conventional explosives to symmetrically compress a subcritical plutonium core into a supercritical state, initiating a rapid, uncontrolled nuclear chain reaction.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c886688190967be07322597ac9 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:31 a.m.