Triple
T16939356
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Operation Bowline |
E410908
|
entity |
| Predicate | containsTest |
P125315
|
FINISHED |
| Object | Rivet II |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rivet II | Statement: [Operation Bowline, containsTest, Rivet II]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Rivet II Context triple: [Operation Bowline, containsTest, Rivet II]
-
A.
Rivet II
chosen
Rivet II was a specific underground nuclear test conducted by the United States as part of its Cold War-era nuclear weapons development program.
-
B.
Rivet III
Rivet III was a specific underground nuclear test conducted by the United States as part of its Cold War-era weapons development program.
-
C.
Rivet IV
Rivet IV was a specific underground nuclear test conducted by the United States as part of its Cold War–era nuclear weapons development program.
-
D.
Rivet VII
Rivet VII was a specific underground nuclear test conducted by the United States as part of its Cold War–era Operation Crosstie test series.
-
E.
Rivet XIX
Rivet XIX was a specific underground nuclear test device detonated by the United States as part of its Cold War–era Operation Crosstie test series.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886c886688190967be07322597ac9 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3cf2c44288190a105761ae646989e |
completed | April 18, 2026, 6:36 p.m. |
Created at: April 10, 2026, 5:31 a.m.