Triple
T16935443
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rotem bi-level coach |
E410815
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bi-level passenger coach |
C5313
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bi-level passenger coach Context triple: [Rotem bi-level coach, instanceOf, bi-level passenger coach]
-
A.
bi-level passenger railcar
chosen
A bi-level passenger railcar is a rail vehicle with two passenger decks designed to increase seating capacity and improve space efficiency on trains.
-
B.
intercity coach
An intercity coach is a long-distance, high-capacity passenger vehicle designed for comfortable travel between cities, typically featuring reserved seating, luggage storage, and onboard amenities.
-
C.
intercity coach service
An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
-
D.
passenger train
A passenger train is a rail vehicle or series of connected vehicles designed to transport people and their luggage between stations along a fixed route and schedule.
-
E.
single-level passenger car
A single-level passenger car is a rail vehicle designed with one continuous floor level to transport seated and standing passengers, typically featuring aisles, doors, and amenities for short- to medium-distance travel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886c886688190967be07322597ac9 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:30 a.m.