Triple

T16926231
Position Surface form Disambiguated ID Type / Status
Subject Southeastern United States electric grid E410579 entity
Predicate hasMajorNuclearPlant P25392 FINISHED
Object Vogtle Electric Generating Plant E86594 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vogtle Electric Generating Plant | Statement: [Southeastern United States electric grid, hasMajorNuclearPlant, Vogtle Electric Generating Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vogtle Electric Generating Plant
Context triple: [Southeastern United States electric grid, hasMajorNuclearPlant, Vogtle Electric Generating Plant]
  • A. Vogtle Electric Generating Plant chosen
    Vogtle Electric Generating Plant is a major nuclear power facility in Georgia, USA, notable for hosting some of the first newly constructed commercial nuclear reactors in the country in decades.
  • B. Joseph M. Farley Nuclear Plant
    The Joseph M. Farley Nuclear Plant is a commercial nuclear power station in Alabama that generates electricity using pressurized water reactors.
  • C. Watts Bar Nuclear Plant
    Watts Bar Nuclear Plant is a Tennessee Valley Authority-operated nuclear power station in eastern Tennessee known for its pressurized water reactors that generate electricity for the regional grid.
  • D. Enrico Fermi Nuclear Generating Station
    The Enrico Fermi Nuclear Generating Station is a nuclear power plant complex located on the shore of Lake Erie in Michigan, known for housing multiple reactor units including the Fermi 2 boiling water reactor.
  • E. Springfield Nuclear Power Plant
    The Springfield Nuclear Power Plant is the accident-prone workplace of Homer Simpson and a central setting in the animated television series "The Simpsons," symbolizing corporate greed, environmental hazards, and satirical takes on nuclear energy.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasMajorNuclearPlant
Context triple: [Southeastern United States electric grid, hasMajorNuclearPlant, Vogtle Electric Generating Plant]
  • A. hasNuclearPowerPlantNearby
    Indicates that an entity is located close to at least one nuclear power plant.
  • B. hadNuclearFacilities
    Indicates that an entity possessed or operated nuclear-related installations or infrastructure.
  • C. hasIndustrialPlant chosen
    Indicates that an entity possesses, operates, or is associated with an industrial plant facility.
  • D. hasNuclearWeapons
    Indicates that the subject possesses or controls nuclear weapons.
  • E. hasNuclearRole
    Indicates that an entity participates in, is responsible for, or holds authority related to nuclear activities, functions, or capabilities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c7b1e481908c3766dfa8c13458 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3cdf2dcd881909798bd245e18c599 completed April 18, 2026, 6:31 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00dc024d7c8190b8055833ed8908d5 completed May 10, 2026, 7:26 p.m.
PD Predicate disambiguation batch_69e32b982f548190b08414d55810de19 completed April 18, 2026, 6:58 a.m.
Created at: April 10, 2026, 5:30 a.m.