Triple

T16926226
Position Surface form Disambiguated ID Type / Status
Subject Southeastern United States electric grid E410579 entity
Predicate hasMajorUtility P124775 FINISHED
Object Duke Energy E165275 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Duke Energy | Statement: [Southeastern United States electric grid, hasMajorUtility, Duke Energy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Duke Energy
Context triple: [Southeastern United States electric grid, hasMajorUtility, Duke Energy]
  • A. Dominion Energy
    Dominion Energy is a large American energy company that generates and distributes electricity and natural gas to customers across multiple states, particularly in the Mid-Atlantic and Southeast regions.
  • B. Cinergy Corporation
    Cinergy Corporation was a U.S.-based energy company best known in part for its naming rights sponsorship of Cincinnati’s Cinergy Field baseball stadium.
  • C. Southern Company
    Southern Company is one of the largest U.S. energy providers, primarily supplying electricity and natural gas across the southeastern United States through its regulated utilities and related businesses.
  • D. Constellation Energy
    Constellation Energy is a U.S.-based energy company that generates and supplies electricity, with a significant focus on nuclear power and other low-carbon energy sources.
  • E. Duke Power Company chosen
    Duke Power Company is a U.S. electric utility company historically known for its involvement in the landmark employment discrimination case Griggs v. Duke Power Co.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasMajorUtility
Context triple: [Southeastern United States electric grid, hasMajorUtility, Duke Energy]
  • A. hasMajor
    Indicates that an entity (typically a person or student) has a specific primary field of academic study or specialization.
  • B. hasMajorCategory
    Indicates that something is associated with or classified under a primary, overarching category.
  • C. hasMajorCurrent
    Indicates that an entity currently has a primary field of study or specialization.
  • D. hasMajorCityOfUse
    Indicates that a particular city is the primary or most significant location where something (e.g., a product, language, service) is predominantly used or applied.
  • E. hasMajorComponent
    Indicates that one entity includes another entity as a primary or most significant component or part.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886c7b1e481908c3766dfa8c13458 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e3cdf2dcd881909798bd245e18c599 completed April 18, 2026, 6:31 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00dc024d7c8190b8055833ed8908d5 completed May 10, 2026, 7:26 p.m.
PD Predicate disambiguation batch_69e32b982f548190b08414d55810de19 completed April 18, 2026, 6:58 a.m.
PDg Predicate description generation batch_69e32d7aae948190bc238d765795688c completed April 18, 2026, 7:06 a.m.
Created at: April 10, 2026, 5:30 a.m.