Triple
T16926218
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Southeastern United States electric grid |
E410579
|
entity |
| Predicate | interconnectedWith |
P845
|
FINISHED |
| Object | Eastern Interconnection |
E123613
|
NE FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Eastern Interconnection Context triple: [Southeastern United States electric grid, interconnectedWith, Eastern Interconnection]
-
A.
Eastern Interconnection
chosen
The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
-
B.
Western Interconnection
The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
-
C.
Midcontinent Independent System Operator region
The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
-
D.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
E.
Northeast Power Coordinating Council
The Northeast Power Coordinating Council is a regional reliability organization that oversees and promotes the reliable and secure operation of the bulk power system in the northeastern part of North America.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69d886c7b1e481908c3766dfa8c13458 |
elicitation | completed |
| NER | batch_69e3cdf2dcd881909798bd245e18c599 |
ner | completed |
| NED1 | batch_6a00cfd8a88c8190adda386b62fe543c |
ned_source_triple | completed |
Created at: April 10, 2026, 5:30 a.m.