Triple
T16920787
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sentinel programme |
E410438
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Earth observation satellite programme |
C9200
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Earth observation satellite programme Context triple: [Sentinel programme, instanceOf, Earth observation satellite programme]
-
A.
polar-orbiting weather satellite program
A polar-orbiting weather satellite program is a coordinated system of satellites in near-polar orbits that provide global, high-resolution observations of atmospheric, oceanic, and surface conditions for weather forecasting and climate monitoring.
-
B.
remote sensing satellite
A remote sensing satellite is an orbiting spacecraft equipped with sensors that collect data about the Earth's surface and atmosphere for applications such as mapping, environmental monitoring, and resource management.
-
C.
Earth observation data access tool
A software system that enables users to discover, query, and retrieve Earth observation datasets from various sensors and repositories through a unified, user-friendly interface.
-
D.
satellite program
chosen
A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
-
E.
greenhouse gas monitoring satellite
A greenhouse gas monitoring satellite is an orbiting platform equipped with specialized sensors to detect, measure, and map atmospheric concentrations of gases like CO₂ and methane for climate and environmental analysis.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886c7b1e481908c3766dfa8c13458 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:30 a.m.