Triple

T16890960
Position Surface form Disambiguated ID Type / Status
Subject Sacramento–San Joaquin River Delta and Suisun Marsh E424168 entity
Predicate isMajorComponentOf P28620 FINISHED
Object Central Valley Project E9027 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Valley Project | Statement: [Sacramento–San Joaquin River Delta and Suisun Marsh, isMajorComponentOf, Central Valley Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Valley Project
Context triple: [Sacramento–San Joaquin River Delta and Suisun Marsh, isMajorComponentOf, Central Valley Project]
  • A. Central Valley Project chosen
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • B. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • C. State Water Project
    The State Water Project is a massive California water storage and delivery system that transports water from northern sources to agricultural, urban, and industrial users across the state, including the Central Valley.
  • D. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • E. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889da3e8c8190a2b118f383f0beac completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e3bbc473d4819090cfea374ef5ca49 completed April 18, 2026, 5:13 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00c7a7fd8481908ef82a13418b1c2d completed May 10, 2026, 6 p.m.
Created at: April 10, 2026, 5:29 a.m.