Triple

T1689039
Position Surface form Disambiguated ID Type / Status
Subject Yuma, Arizona E36508 entity
Predicate highwayServedBy P385 FINISHED
Object Interstate 8 E152509 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 8 | Statement: [Yuma, Arizona, highwayServedBy, Interstate 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 8
Context triple: [Yuma, Arizona, highwayServedBy, Interstate 8]
  • A. Interstate 8 chosen
    Interstate 8 is a major east–west U.S. Interstate Highway running from San Diego, California, to the Arizona border near Yuma, serving as a key route across the southernmost part of the Southwest.
  • B. Interstate 82
    Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
  • C. Interstate 190
    Interstate 190 is a short auxiliary Interstate Highway in Illinois that connects the Kennedy Expressway to Chicago’s O’Hare International Airport.
  • D. Interstate 190
    Interstate 190 is a major auxiliary Interstate Highway in western New York that connects Buffalo to Niagara Falls and the Canadian border.
  • E. Interstate 57
    Interstate 57 is a major north–south U.S. Interstate Highway running from Chicago, Illinois, to Sikeston, Missouri, serving as a key route through the central United States.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a886151508819084fa7f1ce6e05577 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa6296655c8190835ec0d20f7460ca completed March 6, 2026, 5:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69c82735d8988190b4805d5af9f7d3a1 completed March 28, 2026, 7:08 p.m.
Created at: March 4, 2026, 7:29 p.m.