Triple

T16883591
Position Surface form Disambiguated ID Type / Status
Subject Expo 92 E421481 entity
Predicate railConnectionInauguratedFor P47500 FINISHED
Object Madrid–Seville AVE line E1161576 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Seville AVE line | Statement: [Expo 92, railConnectionInauguratedFor, Madrid–Seville AVE line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Madrid–Seville AVE line
Context triple: [Expo 92, railConnectionInauguratedFor, Madrid–Seville AVE line]
  • A. Madrid–Seville high-speed rail line chosen
    The Madrid–Seville high-speed rail line is a pioneering Spanish high-speed railway corridor that connects the capital Madrid with Seville in Andalusia and helped launch Spain’s modern AVE network.
  • B. Madrid–Valladolid high-speed line
    The Madrid–Valladolid high-speed line is a major Spanish AVE railway corridor connecting Madrid with Valladolid as part of the country’s high-speed rail network.
  • C. Madrid–Huesca high-speed rail line
    The Madrid–Huesca high-speed rail line is a Spanish AVE route that connects Madrid with northeastern Aragon, forming part of the country’s core high-speed rail network.
  • D. Madrid–Toledo high-speed rail line
    The Madrid–Toledo high-speed rail line is a Spanish AVE route that connects the capital Madrid with the historic city of Toledo via dedicated high-speed tracks.
  • E. Madrid–Zaragoza–Lleida high-speed line
    The Madrid–Zaragoza–Lleida high-speed line is a major section of Spain’s AVE network that connects Madrid with northeastern cities on dedicated high-speed rail infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railConnectionInauguratedFor
Context triple: [Expo 92, railConnectionInauguratedFor, Madrid–Seville AVE line]
  • A. railwayLineOpened
    Indicates that a railway line began official operation or service on a specified date.
  • B. railwayOpenedWith chosen
    Indicates that a railway line or section was inaugurated and began operation together with a specified associated element (such as a station, segment, or service).
  • C. railwayConnectsTo
    Indicates that one railway line, track, or network is directly linked or joined to another, allowing trains to move between them.
  • D. railwaySectionOpeningDate
    Indicates the date on which a specific section of a railway line was officially opened for operation.
  • E. metroLineInaugurated
    Indicates that a metro line was officially opened and began operation on a specific date or during a specific event.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d470fc8190b4aec199636c0c56 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e3bbbf0cec819084216807601afad1 completed April 18, 2026, 5:13 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00c7a61c608190909a462e9e77220b completed May 10, 2026, 6 p.m.
PD Predicate disambiguation batch_69e32b90ec3c819099c51bb7baf2984c completed April 18, 2026, 6:58 a.m.
Created at: April 10, 2026, 5:29 a.m.