Triple

T16874889
Position Surface form Disambiguated ID Type / Status
Subject Stranraer–Larne ferry (historical alignment) E421273 entity
Predicate instanceOf P0 FINISHED
Object former transport corridor segment C15590 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former transport corridor segment
Context triple: [Stranraer–Larne ferry (historical alignment), instanceOf, former transport corridor segment]
  • A. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • C. former transit line chosen
    A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
  • D. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d470fc8190b4aec199636c0c56 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:29 a.m.