Triple

T16865048
Position Surface form Disambiguated ID Type / Status
Subject Rail Safety and Standards Board E410015 entity
Predicate instanceOf P0 FINISHED
Object railway safety organisation C4607 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway safety organisation
Context triple: [Rail Safety and Standards Board, instanceOf, railway safety organisation]
  • A. rail safety regulator
    A rail safety regulator is an authority responsible for setting, monitoring, and enforcing safety standards and practices across railway systems to protect passengers, workers, and the public.
  • B. railway industry body chosen
    A railway industry body is an organization that represents, coordinates, and sets standards or policies for companies and stakeholders involved in the rail transport sector.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • E. railway portal
    A railway portal is a structural entrance or gateway, typically at the mouth of a tunnel or major rail facility, that marks the transition between open track and enclosed or specialized railway infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88395e6c88190b22730f335107c14 completed April 10, 2026, 4:59 a.m.
Created at: April 10, 2026, 5:24 a.m.