Triple

T16832715
Position Surface form Disambiguated ID Type / Status
Subject Homeland Security Presidential Directive 5 E409188 entity
Predicate implementationInstrument P103504 FINISHED
Object National Response Plan E109607 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Response Plan | Statement: [Homeland Security Presidential Directive 5, implementationInstrument, National Response Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Response Plan
Context triple: [Homeland Security Presidential Directive 5, implementationInstrument, National Response Plan]
  • A. National Response Framework chosen
    The National Response Framework is a United States guiding doctrine that outlines how the nation responds to all types of disasters and emergencies by coordinating roles, responsibilities, and resources across government and partner organizations.
  • B. National Contingency Plan
    The National Contingency Plan is the United States’ federal blueprint for responding to oil spills and hazardous substance releases, coordinating roles, responsibilities, and procedures among agencies during environmental emergencies.
  • C. National Preparedness System
    The National Preparedness System is a U.S. framework that guides how the nation builds, sustains, and delivers the capabilities needed to prevent, protect against, mitigate, respond to, and recover from disasters and other threats.
  • D. National Emergency Communications Plan
    The National Emergency Communications Plan is a U.S. strategic framework that guides how public safety agencies and government entities coordinate and improve interoperable communications before, during, and after emergencies and disasters.
  • E. National Continuity Policy
    The National Continuity Policy is a U.S. federal framework that ensures essential government functions can continue during and after national emergencies or catastrophic events.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: implementationInstrument
Context triple: [Homeland Security Presidential Directive 5, implementationInstrument, National Response Plan]
  • A. installedInstrument
    Indicates that one entity has placed or set up another entity as an instrument or device for use in a particular context or system.
  • B. alternativeInstrumentation
    Indicates that an entity uses a different or substitute set of instruments or instrumentation compared to a standard, primary, or original configuration.
  • C. implementationType
    Indicates the specific manner or approach by which something is implemented or realized in practice.
  • D. implementedOn
    Indicates that something (such as a feature, standard, or specification) is realized, executed, or put into effect within or on a particular platform, system, or environment.
  • E. enablingInstrument chosen
    Indicates that one entity serves as the means, tool, or instrument that enables another entity’s action or effect to occur.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883952b048190887740a980b712ed completed April 10, 2026, 4:59 a.m.
NER Named-entity recognition batch_69e3b318b8b88190b3266f4f06a955c1 completed April 18, 2026, 4:36 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00d452505c8190b6d37b54b2f665f0 completed May 10, 2026, 6:54 p.m.
PD Predicate disambiguation batch_69e32b87b4248190aaddb05e88452356 completed April 18, 2026, 6:58 a.m.
Created at: April 10, 2026, 5:23 a.m.