Triple
T1680380
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Transport Act 1947 |
E36324
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | UK transport legislation |
C2534
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: UK transport legislation Context triple: [Transport Act 1947, instanceOf, UK transport legislation]
-
A.
rail safety legislation
Rail safety legislation comprises the laws and regulations that govern the safe design, operation, maintenance, and oversight of railway systems to protect passengers, workers, and the public.
-
B.
road in the United Kingdom
A road in the United Kingdom is a public or private thoroughfare designed for vehicular and pedestrian travel, classified and regulated according to national standards such as motorways, A-roads, B-roads, and local streets.
-
C.
Inland Transport Committee
The Inland Transport Committee is a policy-making body that develops and coordinates international regulations, standards, and best practices to promote safe, efficient, and sustainable inland transport systems.
-
D.
transport ministry
The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
-
E.
Act of Parliament of the United Kingdom
chosen
An Act of Parliament of the United Kingdom is a formal law enacted by the UK Parliament, comprising the House of Commons, the House of Lords, and the monarch, which has legal force throughout its applicable jurisdictions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a886139ed081909af0940aa9313512 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:29 p.m.