Triple

T16781696
Position Surface form Disambiguated ID Type / Status
Subject Future Surface Combatant programme E407871 entity
Predicate instanceOf P0 FINISHED
Object Royal Navy programme C38015 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Royal Navy programme
Context triple: [Future Surface Combatant programme, instanceOf, Royal Navy programme]
  • A. Royal Navy destroyer
    A Royal Navy destroyer is a fast, maneuverable warship designed for fleet escort, anti-submarine, anti-air, and surface warfare operations within the United Kingdom’s naval forces.
  • B. Royal Navy warship
    A Royal Navy warship is a commissioned naval vessel of the United Kingdom designed, armed, and operated for maritime defense, power projection, and support of national interests at sea.
  • C. Royal Navy operation
    A Royal Navy operation is a coordinated maritime mission or campaign conducted by the United Kingdom’s naval forces to achieve specific military, security, or humanitarian objectives at sea or in littoral environments.
  • D. Royal Navy submarine class
    A Royal Navy submarine class is a group of submarines built to a common design and set of specifications for service in the United Kingdom’s naval fleet.
  • E. Royal Navy training ship
    A Royal Navy training ship is a vessel designated for the instruction and practical seamanship training of naval recruits, officer cadets, and specialist personnel.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8839270588190886720d9519bbf8f completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:22 a.m.