Triple

T1677621
Position Surface form Disambiguated ID Type / Status
Subject Lycée Bonaparte E36267 entity
Predicate instanceOf P0 FINISHED
Object lycée C490 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lycée
Context triple: [Lycée Bonaparte, instanceOf, lycée]
  • A. secondary school chosen
    A secondary school is an educational institution that provides formal learning for adolescents, typically between primary education and higher or vocational education, focusing on a broad curriculum to prepare students for further study or employment.
  • B. public high school
    A public high school is a government-funded secondary education institution that provides standardized academic and extracurricular programs to adolescents in a designated community or district.
  • C. public school
    A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
  • D. university
    A university is an institution of higher education and research that grants academic degrees and fosters advanced learning across diverse fields of study.
  • E. secondary campus
    A secondary campus is a separate physical site or facility that extends the operations, services, or population of a primary institution, such as a school or college, while remaining administratively connected to it.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a886139ed081909af0940aa9313512 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:29 p.m.