Triple

T1675725
Position Surface form Disambiguated ID Type / Status
Subject Tehran Bus Rapid Transit E36226 entity
Predicate connectsTo P845 FINISHED
Object Tehran Metro E35854 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tehran Metro | Statement: [Tehran Bus Rapid Transit, connectsTo, Tehran Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tehran Metro
Context triple: [Tehran Bus Rapid Transit, connectsTo, Tehran Metro]
  • A. Tehran Metro chosen
    Tehran Metro is the rapid transit system serving Iran’s capital, providing extensive urban and suburban rail transport across the Tehran metropolitan area.
  • B. Tehran Metro Line 9
    Tehran Metro Line 9 is a planned rapid transit line intended to expand and improve the urban rail network in Iran’s capital, Tehran.
  • C. Tehran Metro Line 8
    Tehran Metro Line 8 is a planned or operational rapid transit line within the Tehran Metro system, serving as part of the urban rail network in Iran’s capital.
  • D. Tehran Metro Line 4
    Tehran Metro Line 4 is one of the main east–west rapid transit lines in Tehran’s metro network, serving key urban areas and providing access to major hubs including the route toward Mehrabad International Airport.
  • E. Tehran Bus Rapid Transit
    Tehran Bus Rapid Transit is a dedicated-lane bus network in Iran’s capital that provides high-capacity, rapid public transportation across major urban corridors.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a886139ed081909af0940aa9313512 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa625cb1a08190bf7b138c5bfb90b2 completed March 6, 2026, 5:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69addf3608208190a27b0f949da83fcd completed March 8, 2026, 8:42 p.m.
Created at: March 4, 2026, 7:29 p.m.