Triple

T16750264
Position Surface form Disambiguated ID Type / Status
Subject Air Serbia Catering E407054 entity
Predicate instanceOf P0 FINISHED
Object in-house catering provider C28053 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: in-house catering provider
Context triple: [Air Serbia Catering, instanceOf, in-house catering provider]
  • A. airline catering company chosen
    An airline catering company is a specialized service provider that prepares, packages, and delivers meals, beverages, and related onboard provisions to airlines for in-flight service.
  • B. on-campus dining venue
    An on-campus dining venue is a food service location situated within a college or university that provides meals, snacks, and beverages to students, faculty, staff, and visitors, often accepting campus meal plans and offering spaces for socializing or studying.
  • C. food hall
    A food hall is a large, shared dining space that houses multiple independent food and beverage vendors offering diverse cuisines in a communal setting.
  • D. foodservice industry event
    A foodservice industry event is a planned gathering where professionals and stakeholders in the food and beverage sector meet to network, showcase products, share knowledge, and explore business opportunities.
  • E. meal kit company
    A meal kit company is a business that delivers pre-portioned ingredients and step-by-step recipes directly to customers, enabling them to easily cook fresh, home-style meals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838ffb088190a0b11149929006bf completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:21 a.m.