Triple
T16749908
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kalenić Green Market |
E407045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | green market |
C33843
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: green market Context triple: [Kalenić Green Market, instanceOf, green market]
-
A.
greenbelt
A greenbelt is a designated area of open, undeveloped, and often protected land surrounding or within urban regions, intended to limit urban sprawl, preserve natural habitats, and provide recreational space.
-
B.
greenway
A greenway is a linear, often vegetated corridor of land or water designed primarily for recreation, conservation, and non-motorized transportation.
-
C.
farmers' market
chosen
A farmers' market is a recurring, typically open-air marketplace where local farmers and producers sell fresh, seasonal, and often sustainably grown food and goods directly to consumers.
-
D.
eco-friendly shop
An eco-friendly shop is a retail store that prioritizes environmentally sustainable products and practices, such as selling low-impact goods, minimizing waste, and using renewable or recycled materials.
-
E.
wet market
A wet market is a traditional marketplace, often found in Asian countries, where vendors sell fresh meat, seafood, produce, and other perishable goods in open-air or partially enclosed stalls.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838ffb088190a0b11149929006bf |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:21 a.m.