Triple

T16727561
Position Surface form Disambiguated ID Type / Status
Subject Chicago Area Waterway System E406500 entity
Predicate relatedProject P2830 FINISHED
Object Tunnel and Reservoir Plan (TARP)
The Tunnel and Reservoir Plan (TARP), also known as Chicago’s Deep Tunnel project, is a massive civil engineering and flood-control system designed to capture and store stormwater and sewage to reduce flooding and water pollution in the Chicago metropolitan area.
E1230671 NE FINISHED

Provenance (5 batches)

Stage Batch ID Job type Status
creating batch_69d8838f242881908abd8bc138795886 elicitation completed
NER batch_69e38748f538819097de1fdee9b42f34 ner completed
NED1 batch_6a009d4627b8819087bbd3ae85a67dfc ned_source_triple completed
NED2 batch_6a009eb06d6481909914286301f9b4db ned_description completed
NEDg batch_6a009e1aa6548190b77def9f74d3272a nedg completed
Created at: April 10, 2026, 5:20 a.m.