Triple

T1669329
Position Surface form Disambiguated ID Type / Status
Subject Colorado River E36087 entity
Predicate hasDam P8736 FINISHED
Object Parker Dam E96965 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parker Dam | Statement: [Colorado River, hasDam, Parker Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Parker Dam
Context triple: [Colorado River, hasDam, Parker Dam]
  • A. Parker Dam chosen
    Parker Dam is a concrete arch-gravity dam on the Colorado River best known for creating Lake Havasu and supplying water and hydroelectric power to parts of California and Arizona.
  • B. Wheeler Dam
    Wheeler Dam is a hydroelectric dam on the Tennessee River in northern Alabama that forms Wheeler Lake and helps provide power, navigation, and flood control in the region.
  • C. Red Rock Dam
    Red Rock Dam is a large flood-control and hydroelectric dam on the Des Moines River in central Iowa, forming Lake Red Rock as the state’s largest reservoir.
  • D. Denison Dam
    Denison Dam is a large earthen dam on the Red River between Texas and Oklahoma, built for flood control, hydroelectric power generation, and water supply.
  • E. Conklingville Dam
    Conklingville Dam is a concrete gravity dam in New York that created the Great Sacandaga Lake reservoir for flood control and hydroelectric power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861286808190939afff3ce8ee31e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90adf3d3c81909233e574e79b82a2 completed March 5, 2026, 4:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad7988bda081908a966ae1f589cb8f completed March 8, 2026, 1:28 p.m.
Created at: March 4, 2026, 7:29 p.m.