Triple
T16684782
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Les Machines de l’Île |
E405432
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mechanical art installation |
C37312
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mechanical art installation Context triple: [Les Machines de l’Île, instanceOf, mechanical art installation]
-
A.
mechanical sculpture project
chosen
A mechanical sculpture project is a creative endeavor that combines artistic design with moving mechanical components to produce a dynamic, often interactive, three-dimensional artwork.
-
B.
sculptural mobile
A sculptural mobile is a three-dimensional artwork composed of balanced, suspended elements that move in response to air currents, creating shifting visual compositions in space.
-
C.
public art installation series
A public art installation series is a curated sequence of site-specific artworks displayed in shared communal spaces over time, designed to engage diverse audiences and provoke reflection, dialogue, or interaction within the public realm.
-
D.
art installation series
An art installation series is a cohesive collection of site-specific or spatially arranged artworks presented sequentially or in relation to one another to explore a unifying concept, narrative, or sensory experience.
-
E.
mechanical bird
A mechanical bird is an artificial, bird-like device that mimics the appearance and/or behaviors of a real bird through mechanical or electromechanical components.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838c28748190b3f5967c743940ab |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:19 a.m.