Triple

T16683856
Position Surface form Disambiguated ID Type / Status
Subject Marty Faranan E405406 entity
Predicate screenplayStatus P124240 FINISHED
Object unfinished at beginning of film LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: unfinished at beginning of film | Statement: [Marty Faranan, screenplayStatus, unfinished at beginning of film]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: screenplayStatus
Context triple: [Marty Faranan, screenplayStatus, unfinished at beginning of film]
  • A. screenplayRecord
    Indicates that there exists a record or documentation associated with a particular screenplay, capturing information about its creation, version, or related details.
  • B. filmStatus
    Indicates the current production, release, or availability state of a film (e.g., announced, in production, released, cancelled).
  • C. screenplayType
    Indicates the specific category or format of a screenplay associated with a work or production.
  • D. storyStatus
    Indicates the current state or phase of a story within its lifecycle (e.g., planned, in progress, completed, or archived).
  • E. screenplayForDirector
    Indicates that a screenplay is written or created specifically for a particular director to direct.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838c28748190b3f5967c743940ab completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e37d71a66881908c8d06cc074fdf29 completed April 18, 2026, 12:47 p.m.
PD Predicate disambiguation batch_69e319bc73908190a0e38bc926b31f10 completed April 18, 2026, 5:42 a.m.
PDg Predicate description generation batch_69e326b9e84881909a9166e65bd850d6 completed April 18, 2026, 6:37 a.m.
Created at: April 10, 2026, 5:19 a.m.