Triple

T16680203
Position Surface form Disambiguated ID Type / Status
Subject Birmingham Water Works Board system E405318 entity
Predicate instanceOf P0 FINISHED
Object drinking water supply system C3665 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838c28748190b3f5967c743940ab completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:19 a.m.