Triple
T16654386
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STS-116 |
E404688
|
entity |
| Predicate | missionPatch |
P35903
|
FINISHED |
| Object | STS-116 mission patch |
E404688
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-116 mission patch | Statement: [STS-116, missionPatch, STS-116 mission patch]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-116 mission patch Context triple: [STS-116, missionPatch, STS-116 mission patch]
-
A.
STS-116
chosen
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-111
STS-111 was a 2002 NASA Space Shuttle Endeavour mission to the International Space Station that delivered supplies, equipment, and a new crew as part of ongoing station assembly and maintenance.
-
D.
STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
E.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838b5fbc81908c6575c132b82e80 |
completed | April 10, 2026, 4:58 a.m. |
| NER | Named-entity recognition | batch_69e37bf92de48190aaae3e93039b17f3 |
completed | April 18, 2026, 12:41 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0084c6bf8c81909b376875ae038e3f |
completed | May 10, 2026, 1:14 p.m. |
Created at: April 10, 2026, 5:18 a.m.