Triple

T16654376
Position Surface form Disambiguated ID Type / Status
Subject STS-116 E404688 entity
Predicate missionNumber P26361 FINISHED
Object STS-116 E404688 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-116 | Statement: [STS-116, missionNumber, STS-116]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-116
Context triple: [STS-116, missionNumber, STS-116]
  • A. STS-116 chosen
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • B. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • C. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • D. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • E. STS-112
    STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838b5fbc81908c6575c132b82e80 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e37bf92de48190aaae3e93039b17f3 completed April 18, 2026, 12:41 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0084c6bf8c81909b376875ae038e3f completed May 10, 2026, 1:14 p.m.
Created at: April 10, 2026, 5:18 a.m.