Triple
T16648078
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stanislavski system |
E404528
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | performance system |
C21135
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: performance system Context triple: [Stanislavski system, instanceOf, performance system]
-
A.
performance program
A performance program is a structured plan or set of activities designed to enhance, measure, and showcase the effectiveness, efficiency, or artistic quality of an individual, team, or system over a defined period.
-
B.
performance
chosen
Performance is the measurable effectiveness and efficiency with which an entity, system, or process achieves its intended goals under given conditions.
-
C.
performance package
A performance package is an optional set of enhancements—such as upgraded powertrain, suspension, brakes, and aerodynamics—designed to improve a vehicle’s speed, handling, and overall driving dynamics.
-
D.
performance division
A performance division is an organizational unit within a company or institution dedicated to planning, executing, and optimizing live or recorded artistic, athletic, or entertainment performances.
-
E.
performance group
A performance group is an organized ensemble of individuals who collaboratively create and present artistic or entertainment works to an audience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838a41f08190b0c3f79c47df5078 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:18 a.m.