Triple
T16618565
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bailey bridge |
E403759
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | prefabricated bridge |
C38133
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: prefabricated bridge Context triple: [Bailey bridge, instanceOf, prefabricated bridge]
-
A.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
B.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
-
C.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
-
D.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
-
E.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d883897eb481909eaaa088ba9918d9 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:17 a.m.