Triple
T16618564
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bailey bridge |
E403759
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | temporary bridge |
C5509
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: temporary bridge Context triple: [Bailey bridge, instanceOf, temporary bridge]
-
A.
temporary structure
chosen
A temporary structure is a short-term physical construction erected for a limited duration to serve a specific, often transitional, purpose before being removed or replaced.
-
B.
private bridge
A private bridge is a non-publicly owned structure that spans a physical obstacle, such as a river or road, to provide controlled access exclusively for specific individuals, properties, or organizations.
-
C.
proposed bridge
A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
-
D.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
-
E.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d883897eb481909eaaa088ba9918d9 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:17 a.m.