Triple

T16615504
Position Surface form Disambiguated ID Type / Status
Subject Sacramento–San Joaquin Delta Reform Act of 2009 E403686 entity
Predicate instanceOf P0 FINISHED
Object water management law C38121 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water management law
Context triple: [Sacramento–San Joaquin Delta Reform Act of 2009, instanceOf, water management law]
  • A. water management policy decision
    A water management policy decision is a deliberate choice by authorities or stakeholders that sets rules, priorities, and actions for allocating, conserving, and protecting water resources to balance environmental, social, and economic needs.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. water resources management agreement
    A water resources management agreement is a formal arrangement between parties that defines rights, responsibilities, and coordinated actions for the sustainable allocation, use, protection, and monitoring of shared water resources.
  • D. water management structure
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • E. water resources development act
    The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883897eb481909eaaa088ba9918d9 completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:17 a.m.