Triple
T16592631
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Koyna River |
E403127
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Koyna Dam |
E251145
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Koyna Dam | Statement: [Koyna River, hasDam, Koyna Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Koyna Dam Context triple: [Koyna River, hasDam, Koyna Dam]
-
A.
Koyna Dam
chosen
Koyna Dam is a large masonry dam in Maharashtra, India, renowned for its major hydroelectric power project and role in water management in the Western Ghats region.
-
B.
Kabini Dam
Kabini Dam is a major reservoir and irrigation dam built across the Kabini River in Karnataka, India, supporting water supply, agriculture, and regional wildlife habitats.
-
C.
Kolar Dam
Kolar Dam is a reservoir and irrigation structure built on the Kolar River in Madhya Pradesh, India, primarily used for water supply and agricultural purposes.
-
D.
Kakrapar Dam
Kakrapar Dam is a major irrigation and flood-control structure in Gujarat, India, that supports agriculture and water management in the Tapi River basin.
-
E.
Bhavanisagar Dam
Bhavanisagar Dam is a major masonry dam in Tamil Nadu, India, known for irrigation, flood control, and hydroelectric power generation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d88387363c8190a97a0c942130de97 |
completed | April 10, 2026, 4:58 a.m. |
| NER | Named-entity recognition | batch_69e359a123e8819095cd73cd848a3345 |
completed | April 18, 2026, 10:14 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a011b33bc7081908170fbcde9a65fd6 |
completed | May 10, 2026, 11:56 p.m. |
Created at: April 10, 2026, 5:16 a.m.