Triple

T16592625
Position Surface form Disambiguated ID Type / Status
Subject Koyna River E403127 entity
Predicate knownFor P22 FINISHED
Object Koyna Dam E251145 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Koyna Dam | Statement: [Koyna River, knownFor, Koyna Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Koyna Dam
Context triple: [Koyna River, knownFor, Koyna Dam]
  • A. Koyna Dam chosen
    Koyna Dam is a large masonry dam in Maharashtra, India, renowned for its major hydroelectric power project and role in water management in the Western Ghats region.
  • B. Kabini Dam
    Kabini Dam is a major reservoir and irrigation dam built across the Kabini River in Karnataka, India, supporting water supply, agriculture, and regional wildlife habitats.
  • C. Kolar Dam
    Kolar Dam is a reservoir and irrigation structure built on the Kolar River in Madhya Pradesh, India, primarily used for water supply and agricultural purposes.
  • D. Kakrapar Dam
    Kakrapar Dam is a major irrigation and flood-control structure in Gujarat, India, that supports agriculture and water management in the Tapi River basin.
  • E. Bhavanisagar Dam
    Bhavanisagar Dam is a major masonry dam in Tamil Nadu, India, known for irrigation, flood control, and hydroelectric power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88387363c8190a97a0c942130de97 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e359a123e8819095cd73cd848a3345 completed April 18, 2026, 10:14 a.m.
NED1 Entity disambiguation (via context triple) batch_6a00dbf6507081909f6a49c003f9d6d6 completed May 10, 2026, 7:26 p.m.
Created at: April 10, 2026, 5:16 a.m.