Triple

T1658244
Position Surface form Disambiguated ID Type / Status
Subject Karaj River E35847 entity
Predicate hasInfrastructure P2560 FINISHED
Object Amir Kabir Dam E189004 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Amir Kabir Dam | Statement: [Karaj River, hasInfrastructure, Amir Kabir Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Amir Kabir Dam
Context triple: [Karaj River, hasInfrastructure, Amir Kabir Dam]
  • A. Karaj Dam chosen
    Karaj Dam is a major Iranian concrete arch dam near the city of Karaj that provides water supply, irrigation, and hydroelectric power to the Tehran region.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • D. Atatürk Dam
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • E. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88606aa808190aa0b421b4271f220 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90aafe5e881908158fab83998fd07 completed March 5, 2026, 4:46 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad798680088190a24dd968aab1baf0 completed March 8, 2026, 1:28 p.m.
Created at: March 4, 2026, 7:29 p.m.