Triple

T1657535
Position Surface form Disambiguated ID Type / Status
Subject Carrère and Hastings E35834 entity
Predicate instanceOf P0 FINISHED
Object Beaux-Arts architectural firm C11269 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Beaux-Arts architectural firm
Context triple: [Carrère and Hastings, instanceOf, Beaux-Arts architectural firm]
  • A. modernist architecture firm
    A modernist architecture firm is a design-focused company that creates functional, minimalist buildings emphasizing clean lines, open spaces, and innovative use of modern materials and technology.
  • B. Beaux-Arts building
    A Beaux-Arts building is a grand, formally composed structure characterized by classical symmetry, rich ornamentation, and monumental scale, reflecting the academic architectural principles of the École des Beaux-Arts in Paris.
  • C. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • D. urban design firm
    An urban design firm is a professional organization that plans, designs, and coordinates the development of urban spaces, integrating architecture, landscape, transportation, and community needs to create functional and livable environments.
  • E. architectural family
    An architectural family is a group of related building designs or structures that share common stylistic, functional, or structural characteristics derived from a unifying design concept or lineage.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88606aa808190aa0b421b4271f220 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:29 p.m.