Triple

T16562723
Position Surface form Disambiguated ID Type / Status
Subject Mount Elbert Forebay E402379 entity
Predicate partOf P40 FINISHED
Object Mount Elbert Pumped-Storage Hydroelectric Project
Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
E1219184 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mount Elbert Pumped-Storage Hydroelectric Project | Statement: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mount Elbert Pumped-Storage Hydroelectric Project
Context triple: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
  • A. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • B. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • C. Uncompahgre Project
    The Uncompahgre Project is a U.S. Bureau of Reclamation irrigation and water management project in western Colorado that supplies water to agricultural lands in the Uncompahgre Valley.
  • D. Elephant Butte Dam power plant
    Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
  • E. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mount Elbert Pumped-Storage Hydroelectric Project
Triple: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
Generated description
Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mount Elbert Pumped-Storage Hydroelectric Project
Target entity description: Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
  • A. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • B. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • C. Uncompahgre Project
    The Uncompahgre Project is a U.S. Bureau of Reclamation irrigation and water management project in western Colorado that supplies water to agricultural lands in the Uncompahgre Valley.
  • D. Elephant Butte Dam power plant
    Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
  • E. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838648088190acf97ef11fc3f61b completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e3576f757881909bfc6611361ed16d completed April 18, 2026, 10:05 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0067bfcf78819082bf1a15eebdab86 completed May 10, 2026, 11:10 a.m.
NEDg Description generation batch_6a0068172dbc8190850051968e3cd133 completed May 10, 2026, 11:12 a.m.
NED2 Entity disambiguation (via description) batch_6a006872e5f48190aa76611fcbd0c455 completed May 10, 2026, 11:13 a.m.
Created at: April 10, 2026, 5:15 a.m.