Triple
T16562723
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mount Elbert Forebay |
E402379
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Mount Elbert Pumped-Storage Hydroelectric Project
Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
|
E1219184
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mount Elbert Pumped-Storage Hydroelectric Project | Statement: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mount Elbert Pumped-Storage Hydroelectric Project Context triple: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
-
A.
Cushman Hydroelectric Project
The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
-
B.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
-
C.
Uncompahgre Project
The Uncompahgre Project is a U.S. Bureau of Reclamation irrigation and water management project in western Colorado that supplies water to agricultural lands in the Uncompahgre Valley.
-
D.
Elephant Butte Dam power plant
Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
-
E.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mount Elbert Pumped-Storage Hydroelectric Project Triple: [Mount Elbert Forebay, partOf, Mount Elbert Pumped-Storage Hydroelectric Project]
Generated description
Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Mount Elbert Pumped-Storage Hydroelectric Project Target entity description: Mount Elbert Pumped-Storage Hydroelectric Project is a large pumped-storage hydroelectric power facility in Colorado that uses off-peak electricity to pump water to an upper reservoir for later generation during peak demand.
-
A.
Cushman Hydroelectric Project
The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
-
B.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
-
C.
Uncompahgre Project
The Uncompahgre Project is a U.S. Bureau of Reclamation irrigation and water management project in western Colorado that supplies water to agricultural lands in the Uncompahgre Valley.
-
D.
Elephant Butte Dam power plant
Elephant Butte Dam power plant is a hydroelectric facility in New Mexico that generates electricity using water released from Elephant Butte Reservoir on the Rio Grande.
-
E.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838648088190acf97ef11fc3f61b |
completed | April 10, 2026, 4:58 a.m. |
| NER | Named-entity recognition | batch_69e3576f757881909bfc6611361ed16d |
completed | April 18, 2026, 10:05 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0067bfcf78819082bf1a15eebdab86 |
completed | May 10, 2026, 11:10 a.m. |
| NEDg | Description generation | batch_6a0068172dbc8190850051968e3cd133 |
completed | May 10, 2026, 11:12 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a006872e5f48190aa76611fcbd0c455 |
completed | May 10, 2026, 11:13 a.m. |
Created at: April 10, 2026, 5:15 a.m.