Triple

T16562403
Position Surface form Disambiguated ID Type / Status
Subject NextEra Energy, Inc. E402372 entity
Predicate instanceOf P0 FINISHED
Object clean energy company C14998 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: clean energy company
Context triple: [NextEra Energy, Inc., instanceOf, clean energy company]
  • A. energy solutions company
    An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
  • B. renewable energy developer chosen
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • C. wind power company
    A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
  • D. energy infrastructure company
    An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
  • E. wholesale energy company
    A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838648088190acf97ef11fc3f61b completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:15 a.m.