Triple
T16560502
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Łódź–Koluszki railway |
E402324
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway infrastructure in Poland |
C3584
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway infrastructure in Poland Context triple: [Łódź–Koluszki railway, instanceOf, railway infrastructure in Poland]
-
A.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
B.
railway infrastructure element
A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
-
C.
rail transportation infrastructure
chosen
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
D.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
E.
railway policy implementation
Railway policy implementation is the process of translating rail-related laws, regulations, and strategic plans into concrete operational actions, projects, and standards across the railway system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838648088190acf97ef11fc3f61b |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:15 a.m.