Triple
T16542899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Skycab |
E401864
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevated monorail system |
C539
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevated monorail system Context triple: [Skycab, instanceOf, elevated monorail system]
-
A.
elevated railway
chosen
An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
-
B.
suspended monorail
A suspended monorail is an elevated rail transport system in which vehicles hang from a single overhead track, providing efficient, space-saving urban or interurban transit.
-
C.
straddle-beam monorail
A straddle-beam monorail is a transit system in which rubber-tired vehicles ride astride a single elevated concrete or steel beam, using it for both support and guidance.
-
D.
monorail transit line
A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
-
E.
monorail line
A monorail line is a guided transit route where trains run on a single rail or beam, typically elevated, providing efficient and often automated urban or interurban transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d88384bc30819084229e7dcdc39a41 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:15 a.m.