Triple

T16513808
Position Surface form Disambiguated ID Type / Status
Subject Norfolk Southern trackage in Indiana and Illinois E401128 entity
Predicate instanceOf P0 FINISHED
Object railway infrastructure network segment C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway infrastructure network segment
Context triple: [Norfolk Southern trackage in Indiana and Illinois, instanceOf, railway infrastructure network segment]
  • A. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • B. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • C. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. railway line segment collection
    A railway line segment collection represents an organized set of connected or related railway track segments treated as a single logical unit for analysis, management, or operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88381f6148190819958a038be990e completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:14 a.m.