Triple

T1650641
Position Surface form Disambiguated ID Type / Status
Subject 2032 Summer Olympics E35681 entity
Predicate isCancelled P30890 FINISHED
Object false LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: false | Statement: [2032 Summer Olympics, isCancelled, false]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isCancelled
Context triple: [2032 Summer Olympics, isCancelled, false]
  • A. cancellation
    Indicates that a previously planned or scheduled event, action, or agreement is being annulled, terminated, or rendered no longer valid.
  • B. cancellationReason
    Indicates the reason or cause for which a previously scheduled or planned action, event, or agreement was canceled.
  • C. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • D. cancellationYear
    Indicates the year in which something (such as an event, contract, or service) was officially canceled or terminated.
  • E. hasStop
    Indicates that something (such as a route, service, or journey) includes or is associated with a particular stop or stopping point.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8860568888190a32cd9f70acbba42 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aaa0fbe984819084f8daee81ca9b67 completed March 6, 2026, 9:40 a.m.
PD Predicate disambiguation batch_69a907ce4dd881909168a1e99505d4ec completed March 5, 2026, 4:34 a.m.
PDg Predicate description generation batch_69a949509d508190a3a35554996823de completed March 5, 2026, 9:13 a.m.
Created at: March 4, 2026, 7:29 p.m.