Triple
T1650377
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Guangzhou Railway Station |
E35676
|
entity |
| Predicate | isMajorStationOn |
P30882
|
FINISHED |
| Object |
Guangzhou–Maoming railway
The Guangzhou–Maoming railway is a major rail line in Guangdong Province, China, connecting the provincial capital Guangzhou with the western city of Maoming and serving as an important corridor for regional passenger and freight transport.
|
E187934
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Guangzhou–Maoming railway | Statement: [Guangzhou Railway Station, isMajorStationOn, Guangzhou–Maoming railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Guangzhou–Maoming railway Context triple: [Guangzhou Railway Station, isMajorStationOn, Guangzhou–Maoming railway]
-
A.
Hengyang–Guilin–Liuzhou rail corridor
The Hengyang–Guilin–Liuzhou rail corridor is a strategically important railway line in southern China linking key cities in Hunan and Guangxi and serving as a major north–south transportation route.
-
B.
Guizhou–Guangxi railway
The Guizhou–Guangxi railway is a major rail line in southern China that connects the inland province of Guizhou with the Guangxi region, facilitating regional transport and economic integration.
-
C.
Wuhan–Guangzhou High-Speed Railway
The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
-
D.
Liuzhou–Nanning intercity railway
The Liuzhou–Nanning intercity railway is a high-speed rail line in Guangxi, China, connecting the cities of Liuzhou and Nanning to support rapid regional passenger transport.
-
E.
Hefei–Wuhan Railway
The Hefei–Wuhan Railway is a high-speed rail line in China connecting the cities of Hefei and Wuhan as part of the country’s major east–west passenger corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Guangzhou–Maoming railway Triple: [Guangzhou Railway Station, isMajorStationOn, Guangzhou–Maoming railway]
Generated description
The Guangzhou–Maoming railway is a major rail line in Guangdong Province, China, connecting the provincial capital Guangzhou with the western city of Maoming and serving as an important corridor for regional passenger and freight transport.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Guangzhou–Maoming railway Target entity description: The Guangzhou–Maoming railway is a major rail line in Guangdong Province, China, connecting the provincial capital Guangzhou with the western city of Maoming and serving as an important corridor for regional passenger and freight transport.
-
A.
Hengyang–Guilin–Liuzhou rail corridor
The Hengyang–Guilin–Liuzhou rail corridor is a strategically important railway line in southern China linking key cities in Hunan and Guangxi and serving as a major north–south transportation route.
-
B.
Guizhou–Guangxi railway
The Guizhou–Guangxi railway is a major rail line in southern China that connects the inland province of Guizhou with the Guangxi region, facilitating regional transport and economic integration.
-
C.
Wuhan–Guangzhou High-Speed Railway
The Wuhan–Guangzhou High-Speed Railway is a major Chinese high-speed rail corridor linking central and southern China as part of the Beijing–Guangzhou HSR route, significantly reducing travel times between Wuhan and Guangzhou.
-
D.
Liuzhou–Nanning intercity railway
The Liuzhou–Nanning intercity railway is a high-speed rail line in Guangxi, China, connecting the cities of Liuzhou and Nanning to support rapid regional passenger transport.
-
E.
Hefei–Wuhan Railway
The Hefei–Wuhan Railway is a high-speed rail line in China connecting the cities of Hefei and Wuhan as part of the country’s major east–west passenger corridor.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8860568888190a32cd9f70acbba42 |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69aa61e142ac8190aa2fbd8f0826b5b2 |
completed | March 6, 2026, 5:10 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad681db3408190a3b469e319486419 |
completed | March 8, 2026, 12:14 p.m. |
| NEDg | Description generation | batch_69ad692a4078819080c3a89166917081 |
completed | March 8, 2026, 12:18 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ad698929f88190af97fc915d29a5b5 |
completed | March 8, 2026, 12:20 p.m. |
Created at: March 4, 2026, 7:29 p.m.