Triple

T16502591
Position Surface form Disambiguated ID Type / Status
Subject Secret Beach (Oregon) E400834 entity
Predicate locatedNear P294 FINISHED
Object Highway 101 E1223727 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Highway 101 | Statement: [Secret Beach (Oregon), locatedNear, Highway 101]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Highway 101
Context triple: [Secret Beach (Oregon), locatedNear, Highway 101]
  • A. Highway 101
    Highway 101 is a major Ontario provincial highway in Canada that runs east–west across Northern Ontario, connecting several remote communities and resource-based regions.
  • B. Highway 101
    Highway 101 is a major highway in Nova Scotia, Canada, that serves as a key transportation corridor through the Annapolis Valley and connects several communities in the region.
  • C. Highway 101 chosen
    Highway 101 is a major north–south U.S. route running along the West Coast, serving as a key corridor through California’s Wine Country and other coastal regions.
  • D. Highway 1
    Highway 1 is a primary east–west transportation route in Canada that forms part of the Trans-Canada Highway system.
  • E. Highway 1
    Highway 1 is a major Israeli roadway that serves as a primary route between Tel Aviv and Jerusalem and continues eastward toward the Jordan Valley.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88381f6148190819958a038be990e completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e32e50436c8190836a1bc2baa188b1 completed April 18, 2026, 7:10 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0084ac013c81909ce7055de4f12e58 completed May 10, 2026, 1:14 p.m.
Created at: April 10, 2026, 5:14 a.m.