Triple
T16489040
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Japan Meteorological Observatory network |
E400522
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | weather monitoring system |
C2064
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: weather monitoring system Context triple: [Japan Meteorological Observatory network, instanceOf, weather monitoring system]
-
A.
meteorological infrastructure
Meteorological infrastructure comprises the interconnected network of instruments, stations, communication systems, and data-processing facilities used to observe, measure, and analyze atmospheric conditions for weather forecasting and climate monitoring.
-
B.
meteorological decision-support tool
A meteorological decision-support tool is a system that integrates weather data, forecasts, and analytical models to help users make informed operational and strategic decisions based on atmospheric conditions.
-
C.
animal weather forecaster
An animal weather forecaster is a creature whose observed behaviors or biological responses are interpreted as indicators of upcoming weather conditions.
-
D.
weather vane
A weather vane is a device, typically mounted on a high point like a rooftop, that rotates to show the direction from which the wind is blowing.
-
E.
meteorological data communication network
chosen
A meteorological data communication network is a system of interconnected sensors, transmission links, and processing nodes that collect, transmit, and distribute weather and atmospheric data in real time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d883813098819084f5409539723b59 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:13 a.m.