Triple

T16484709
Position Surface form Disambiguated ID Type / Status
Subject Centralized Traffic Control E400408 entity
Predicate instanceOf P0 FINISHED
Object train traffic management system C11412 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: train traffic management system
Context triple: [Centralized Traffic Control, instanceOf, train traffic management system]
  • A. traffic management scheme
    A traffic management scheme is a coordinated set of policies, controls, and infrastructure measures designed to regulate and optimize the movement of vehicles, pedestrians, and goods within a transportation network.
  • B. traffic authority
    A traffic authority is an organization or governmental body responsible for planning, regulating, and managing road use, traffic flow, and transportation safety within a specific jurisdiction.
  • C. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • D. intelligent transportation system component chosen
    An intelligent transportation system component is a hardware or software element that collects, processes, or communicates transportation-related data to optimize traffic flow, enhance safety, and improve overall system efficiency.
  • E. transponder-based toll system
    A transponder-based toll system is an automated electronic toll collection method where vehicles equipped with small radio-frequency devices are detected and charged as they pass through toll points without stopping.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883813098819084f5409539723b59 completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:13 a.m.