Triple
T16478143
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Elephant Butte Reservoir |
E400240
|
entity |
| Predicate | partOfProject |
P10
|
FINISHED |
| Object |
Rio Grande Project
The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
|
E1215096
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rio Grande Project | Statement: [Elephant Butte Reservoir, partOfProject, Rio Grande Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Rio Grande Project Context triple: [Elephant Butte Reservoir, partOfProject, Rio Grande Project]
-
A.
Lower Colorado River Project
The Lower Colorado River Project is a major U.S. water management and irrigation system that harnesses the Colorado River to supply water for agriculture, municipalities, and flood control in the arid Southwest.
-
B.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
C.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
D.
Upper American River Project
The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
-
E.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Rio Grande Project Triple: [Elephant Butte Reservoir, partOfProject, Rio Grande Project]
Generated description
The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Rio Grande Project Target entity description: The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
-
A.
Lower Colorado River Project
The Lower Colorado River Project is a major U.S. water management and irrigation system that harnesses the Colorado River to supply water for agriculture, municipalities, and flood control in the arid Southwest.
-
B.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
C.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
D.
Upper American River Project
The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
-
E.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d883813098819084f5409539723b59 |
completed | April 10, 2026, 4:58 a.m. |
| NER | Named-entity recognition | batch_69e32e0013ac8190b607d5f47d17c501 |
completed | April 18, 2026, 7:08 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a004f60ea8881908f073a28c407a1f4 |
completed | May 10, 2026, 9:26 a.m. |
| NEDg | Description generation | batch_6a00513b6fcc8190a548b30cb7b4b67f |
completed | May 10, 2026, 9:34 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a0051def1d48190b40f55c40ab269d2 |
completed | May 10, 2026, 9:37 a.m. |
Created at: April 10, 2026, 5:13 a.m.