Triple

T1647806
Position Surface form Disambiguated ID Type / Status
Subject Hadoop E35621 entity
Predicate instanceOf P0 FINISHED
Object open-source software framework C8314 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: open-source software framework
Context triple: [Hadoop, instanceOf, open-source software framework]
  • A. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • B. free software project chosen
    A free software project is a collaboratively developed software initiative whose source code is openly available and may be used, modified, and redistributed under a license that guarantees these freedoms.
  • C. object-oriented framework
    An object-oriented framework is a reusable, extensible software structure that defines cooperating classes and interfaces to provide a common architecture for building applications in a specific domain.
  • D. graphical user interface framework
    A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
  • E. web framework
    A web framework is a software platform that provides reusable components, tools, and conventions to simplify building, organizing, and deploying web applications and services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8860568888190a32cd9f70acbba42 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:29 p.m.