Triple
T16462380
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Antonio River Authority |
E399837
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river authority |
C19730
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river authority Context triple: [San Antonio River Authority, instanceOf, river authority]
-
A.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
B.
hydropower authority
A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
-
C.
canal authority
A canal authority is an organization responsible for managing, operating, and regulating a canal and its associated waterways, infrastructure, and traffic.
-
D.
water management agency
chosen
A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
-
E.
river basin organization
A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2dac988190b74d6e185fa88ba4 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:10 a.m.