Triple

T16443567
Position Surface form Disambiguated ID Type / Status
Subject Limba Sarda Unificada E399367 entity
Predicate instanceOf P0 FINISHED
Object proposal C1371 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposal
Context triple: [Limba Sarda Unificada, instanceOf, proposal]
  • A. plan
    A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
  • B. political proposal chosen
    A political proposal is a formally articulated plan or set of measures put forward by a political actor or group to address public issues, change policies, or introduce new legislation.
  • C. petition
    A petition is a formal written request, typically signed by multiple people, appealing to an authority to enact a specific change or decision.
  • D. prop
    A prop is a movable object used on stage or screen to support the setting, action, or characterization within a performance.
  • E. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2c6778819080fcfae53be8f12a completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:10 a.m.