Triple
T16433848
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Liverpool docks |
E399133
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Toxteth Dock |
E241080
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Toxteth Dock | Statement: [Liverpool docks, hasPart, Toxteth Dock]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Toxteth Dock Context triple: [Liverpool docks, hasPart, Toxteth Dock]
-
A.
South Dock
South Dock is a major dock and waterway in London’s Docklands, forming part of the redeveloped Canary Wharf financial district.
-
B.
Birkenhead Docks
Birkenhead Docks is a complex of dock facilities on the Wirral Peninsula in northwest England, forming part of the wider Port of Liverpool and serving maritime trade and industry along the River Mersey.
-
C.
Thompson Dock
Thompson Dock is a historic dry dock in Belfast, Northern Ireland, best known as the site where the RMS Titanic was fitted out.
-
D.
Langton Dock
chosen
Langton Dock is one of the historic dock basins within the Port of Liverpool, serving as part of the city's extensive maritime and cargo-handling infrastructure.
-
E.
Western Dock
Western Dock was a major basin within the historic London Docks complex in east London, used primarily for maritime trade and cargo handling.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2b9024819085c20e52de95d583 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e32ba01a1c8190b5a4700e2364ae63 |
completed | April 18, 2026, 6:58 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0045872a688190bcab27c6a2b952cd |
completed | May 10, 2026, 8:44 a.m. |
Created at: April 10, 2026, 5:10 a.m.