Triple
T16431517
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Operation IceBridge |
E399079
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airborne geophysical survey |
C37446
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airborne geophysical survey Context triple: [Operation IceBridge, instanceOf, airborne geophysical survey]
-
A.
geological survey
A geological survey is a systematic investigation and mapping of the Earth's materials, structures, and processes to understand subsurface conditions and support resource management, hazard assessment, and land-use planning.
-
B.
geodetic survey
A geodetic survey is a precise method of measuring and mapping large areas of the Earth's surface that accounts for its curvature and gravitational variations to establish accurate positions, elevations, and reference frameworks.
-
C.
geological mapping program
A geological mapping program is a software tool that enables users to collect, analyze, and visualize spatial geological data to create detailed maps of rock types, structures, and other earth features.
-
D.
geological survey organization
A geological survey organization is an institution that systematically investigates, maps, analyzes, and monitors the Earth’s materials, structures, and processes to support resource management, hazard assessment, and scientific understanding.
-
E.
airborne radar system
An airborne radar system is an integrated aircraft-mounted sensor suite that emits radio waves and processes their reflections to detect, track, and characterize objects or terrain in the surrounding air and ground environment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2b9024819085c20e52de95d583 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:10 a.m.